In one of the most sought-after areas in the north of the island, surrounded by idyllic scenery and a private forest, this plot of flat, fertile land stretches over an impressive 21,150m². The location provides exceptional peace and privacy, ideal for those who wish to experience the authentic charm of Ibiza in a luxurious setting.
With planning permission already in place, a modern villa with a planned living area of 264m² and a swimming pool is ready for construction to begin immediately. Villa de la Luz will feature an avant-garde design that harmoniously integrates with the natural surroundings, blending contemporary brutalist architecture with traditional Ibizan elements.
This single-story villa, designed as a detached family residence, includes three bedrooms distributed across one floor and a basement. Its architecture features five interconnected structures, defining each space while creating a green courtyard to provide natural ventilation and optimal lighting conditions.
The villa includes 264m² of main living space, complemented by a 264m² basement and a swimming pool, totalling 528m² of construction. With a total buildable volume of 900 m³, this villa, designed by a renowned architect, plays with light and shadow to create fluid transitions between rooms, characterized by the highest construction quality.
Permits from local authorities have been fully granted, allowing construction to begin without delay. The site offers an almost level construction area and is already connected to mains electricity, with fibre optic and water connections easily accessible, fulfilling all modern living requirements.
This property combines modern design with traditional charm in an idyllic setting, offering a rare opportunity to bring your dream home to life in one of Ibiza’s most exclusive locations, Can Curune.






| Name: | |
| Email: | |
| Phone: | |
Message: |
|

Urbanización Can Rimbau
07819 Jesus Ibiza
Mob. +34 687 19 79 65
E- Mail: info@realestate-ibiza.net